Project control · PMC
Project control between the drawings and the site
An execution-control layer for developers, societies and main contractors. Design stays with your architect; SSR makes sure what is built matches what was drawn, and keeps the record to prove it.

What we control
Quantities, quality and time
- BOQ, bar bending schedules and material reconciliation
- IS 456 pour cards before every pour
- RFI and NCR registers, kept open until closed
- Firefighting risers, sprinklers and detection, tested and commissioned
- Weekly reports with planned against actual and earned value
- A fee as a percentage of project cost or a fixed retainer, never a margin on materials
From the site
Apex Aura Society, Tower F
Shuttering, slab and firefighting supervision on a 22-week programme from April 2026, from excavation and slabs through firefighting risers to testing and commissioning. These are the controls that ran on it.
What you receive
Reports a director can act on
A daily progress report with photographs, manpower and work done, every site day. A weekly progress report with a management dashboard, BOQ-linked activity log, planned against actual, earned value (SPI and CPI), RFI log, NCR register, material reconciliation, risk register, photo log and next week's plan.
Want to see the daily format? Try the free daily progress report tool.
Questions
Asked before every job
What does a PMC do on a construction site?
A project management consultant controls execution between the approved drawings and the site: quantities, bar bending schedules, pour approvals, quality registers, progress reports and material reconciliation. SSR does not change the design.
How is SSR's PMC fee charged?
As a percentage of project cost or a fixed retainer, never as a margin on materials, so SSR has no reason to inflate quantities.
What reports will we receive?
A daily progress report with photos every site day, and a weekly report with planned against actual, earned value, RFI and NCR registers, material reconciliation and a look-ahead.
Do you supervise firefighting work?
Yes. On Apex Aura Society Tower F the scope ran from slabs and shuttering through firefighting risers, sprinklers and detection to testing and commissioning.