Firefighting · plumbing · waterproofing
Firefighting and plumbing, tested before handover
The services that fail first are the ones SSR tests hardest: fire risers and sprinklers commissioned, every water line pressure-tested before plaster, and every wet area ponded for 48 hours before tiling.
Firefighting
Risers, sprinklers and detection
- Firefighting riser pipework to IS 1239
- Sprinkler and fire detection systems
- Testing and commissioning as part of the scope
- Sleeves placed before the pour, so services need no core cutting later
- Supervised on Apex Aura Society Tower F, Greater Noida West
Plumbing and waterproofing
Concealed, tested, recorded
- Concealed CPVC hot and cold supply, pressure-tested before plaster
- SWR drainage stacks, inspection chambers and rainwater down-takes
- Polymer waterproofing in toilets, balconies and terraces, with a 48-hour ponding test
- Branded pipes and fittings, such as Astral or Ashirvad CPVC and Supreme or Prince SWR
- Test results recorded and handed over with the building
Questions
Asked before every job
Do you test the firefighting system?
Yes. Risers, sprinklers and detection are tested and commissioned as part of the scope, as on Apex Aura Society Tower F.
How do you stop toilets and terraces from leaking?
Polymer-modified waterproofing with upturns at the walls, then a 48-hour ponding test before any tile is laid.
Can you take plumbing or firefighting on its own?
Yes. Plumbing and firefighting can be part of a full SSR build or a separate package. Send the drawings and scope on WhatsApp for a price.
Enquiry
Tell us about your project.
Leave your number and SSR will get back to you, or send the same message on WhatsApp. Drawings, photos and brochures can follow in the chat.
Also from SSR
